SpaceX says its Texas and Arizona supercomputing campuses will pay their own way. A gas plant, a 6-gigawatt grid draw, and two Dec. 9 votes will test that.
SpaceX wants to build a data center in the Arizona desert that would draw 6,000 megawatts of power at full build-out. That is nearly two-thirds of the all-time peak demand that Arizona Public Service⦠[+6759 chars]